What a factory visit changes

Portrait of Santiago Reyes

Santiago Reyes

Mechanical engineer

·

·

5 min

Coolant spraying over a CNC milling job

We visit the factory before the design is frozen, not after. On a full development project that means a trip at the end of the Develop phase, with a working prototype in a suitcase, to the two or three suppliers on the shortlist.

The trip for the Velora C1 is the one we still talk about. Our drawing showed a welded aluminium frame with 14 tube joints. We went to see a frame welder and a foundry in the same week. On the foundry floor the toolmaker looked at the steering head, where five tubes met, and asked why it was not a single casting. Redrawn as one gravity-cast node, it removed six welds and a welding jig, and took $41 off the unit cost of the frame.

What we look at

  • The reject bin: what is in it, and how full it is.

  • The oldest machine still running, and what runs on it.

  • Who does incoming inspection, and with which gauge.

  • How finished parts are packed for the lorry.

  • Whether the person quoting has ever stood at the line.

A part on an automated test rig
The first cast node from the foundry, beside the welded prototype it replaced.

A drawing sent by email gets a quote. A prototype put on a toolmaker’s bench gets opinions, and the opinions are worth more: a draft angle one degree too tight, a rib that will leave a sink mark, a screw the operator cannot reach with the driver they really use. We come home with a list of 30 to 50 changes. Most are small, and together they are the difference between a tool that runs and a tool that is reworked twice.

Ask the toolmaker what they would change. Then be quiet for a while.

Portrait of Santiago Reyes

Written by

Santiago Reyes

Mechanical engineer

Spends about six weeks a year on factory floors and comes back with better drawings.

Have a product in mind?

Send a short brief. A partner replies within two working days with questions, a rough plan and a price range.

Next start: March 2027

Minimum engagement: $24,000

Create a free website with Framer, the website builder loved by startups, designers and agencies.